Plan protection into the stone workflow.

Stone and marble surfaces can be exposed during fabrication, transport and fit-out. A suitable protection strategy starts with the stone type, finish, project stage and the confirmed compatibility of the selected protective film.

Concept placeholder

Risk map

Identify when the surface is most exposed.

This is a project-risk framework, not a claim that one film prevents every type of damage.

01

Fabrication / packing

Handling begins before the slab or panel reaches site.

02

Transport

Movement and contact can expose finished surfaces.

03

Installation

Adjacent trades and tools increase temporary risk.

04

Fit-out

Completed stone may remain exposed while other work continues.

05

Handover

Protection should be removed and the surface checked at the right stage.

Protection zones

Map the protection need to the stone element.

Different stone formats create different handling and edge considerations.

Concept placeholder

Benchtops / counters

High-value horizontal surfaces exposed during fit-out.

Wall panels

Large finished faces vulnerable to contact from adjacent work.

Flooring / large tiles

Installed areas that may need controlled temporary protection.

Fabricated components

Cut and finished pieces handled before final installation.

Film structure

Explain the protection film by function, not unsupported performance numbers.

Populate the exact construction only after product specifications are confirmed.

01

Identify exposure

Map where handling and site activity may affect finished stone.

02

Confirm compatibility

Trial the protection film against the actual stone and finish.

03

Handover process

Document installation, removal timing and inspection requirements.

Application sequence

Protection works best when it is planned, not added at the end.

Link detailed technical instructions once the final product is confirmed.

01

Inspect & clean

02

Test / confirm

03

Apply

04

Protect through works

05

Remove & inspect

Project comparison

Show what the protection plan is trying to control.

Use actual project photography later; avoid exaggerated damage claims.

Concept placeholder

Unprotected workflow

Concept placeholder

Planned protection workflow

Handling notes

Support the film with good project handling.

These are process reminders and should be refined with product-specific instructions.

01

Storage

Keep product and protected components in appropriate project conditions.

02

Edges

Check edges and penetrations where contact can start.

03

Removal

Remove according to the approved method and timing.

04

Documentation

Keep the selected product and project notes available for the site team.

Technical request

Match protection to the stone type, format and project stage.

Share stone type, finish, size, project stage and how long temporary protection is expected to remain.